Guide6 min readUpdated
Website Launch Checklist: Test, Fix and Go Live Safely
Use this website launch checklist to test, fix and publish your site with confidence. Covers before launch, launch day and the first 2 weeks after.
By Tithi Mondal, UI/UX Designer
A bakery owner in Siliguri once sent a new website link to all her WhatsApp customers on the evening before Durga Puja. The order form did not send any message to her phone. For two days, customers filled the form and nobody saw their orders. A single test before launch would have found the problem in one minute.
A website launch checklist is a list of checks you complete before your website becomes public, on the day it goes live, and in the first weeks after. This guide gives you the steps in order. The steps are general, so they work whichever tools or hosting you use.
What should I check before launching a website?
Before launching, check 4 things: the content, the design, the contact points and the legal details. Finish these on a private test version of the site, not on the live address.
Content. Read every page aloud once. Look for spelling mistakes, old phone numbers, wrong prices and leftover placeholder text such as "Lorem ipsum". Check that every photo is the right one for its page. If you have not yet collected all your material, finish that first, because missing content is the most common reason for a late launch.
Design. Compare each page with the approved design. Check headings, colours, spacing and button styles. Small differences are normal, but a missing section is not.
Contact points. Confirm the phone number, WhatsApp number, email and address. Tap each one on a real phone. A WhatsApp button should open a chat with your business number and a ready message.
Legal details. Check the privacy policy, terms and any business registration details you show. Ask a qualified person to review these pages if you collect personal data or take payments.
How do I test a website before it goes live?
Test a website by using it the way a customer would, on the devices your customers own. Most Indian visitors arrive on a mobile phone, so start with the phone.
This website testing checklist covers the main areas.
- Phones. Open every page on at least one mid-range Android phone and one other phone if you can. Scroll, tap and rotate the screen.
- Laptop. Open every page on a laptop in two different browsers.
- Links. Click every menu item, button and link. Each one should open the right page. No link should lead to an error page.
- Forms. Fill and submit every form with real details. Then confirm that you received the message, and that the customer sees a clear thank you.
- Payments. If the site takes payment, make a small real or test payment and check the full journey, including the confirmation message. The post on UPI payment UX and checkout design explains what a good payment flow looks like.
- Speed. Open the site on a slow mobile connection. Large photos are the most common reason for slow pages.
- Reading comfort. Check that text is large enough, and that text colour has strong contrast against the background.
Ask 2 or 3 people who have never seen the site to find your phone number and place a test enquiry. Watch where they hesitate. The usability testing guide shows how to do this cheaply.
What technical steps come before go live?
Before go live, confirm that your domain, security certificate, backup and redirects are ready. A domain is your web address, such as yourbusiness.in. A security certificate is the setting that makes the address start with https and shows a lock sign in the browser.
Check these items with whoever manages your hosting or development.
- The domain points to the new site.
- The https lock sign appears on every page.
- A full backup of the old site exists, if you are replacing a site.
- Old page addresses that people have saved or shared lead to the new matching pages. This is called a redirect.
- Every page has a clear title and a short description for search results.
- Every image has a short text description for people who use screen readers.
- A tool to measure visits is installed, if you want visitor numbers.
- A custom "page not found" message exists.
Ask your developer to confirm each item in writing. A short message on WhatsApp is enough, and the message gives you a record.
What should I do on launch day?
On launch day, publish at a quiet hour, test again immediately, and tell people only after your own checks pass. Avoid launching just before a festival or a big sale, when you have no time to fix problems.
A simple order works well.
- Choose a time when you can watch the site for at least 2 hours.
- Publish the site.
- Open the live address on your phone and your laptop.
- Submit one real form and place one real test order.
- Check that the notification reaches your phone or email.
- Only then share the link on WhatsApp, social media and your email signature.
Keep the developer or designer reachable on launch day. If something breaks, you want a person who can fix the problem the same hour.
What are the after launch tasks for the first 2 weeks?
After launch, check the site every day for 7 days, collect real feedback, and fix small problems quickly. The first week shows issues that testing missed.
- Day 1 to 7: open the site daily. Check forms, orders and messages. Reply to every enquiry.
- Week 1: ask 5 customers what was confusing. Write the answers in one list.
- Week 2: fix the top 3 problems from the list. Update any text that customers misunderstood.
- Every month: check that links work, prices are current, and the copyright year is correct.
Keep a short log of every change with the date. The log helps when something breaks later. If visitors leave quickly or do not contact you, the UX audit checklist helps you find the cause. Also check the website contact page and WhatsApp CTA post, because a weak contact page often explains low enquiries.
Website launch checklist you can copy
Copy this go live checklist and tick each line.
Before launch
- All text proofread, no placeholder text left
- Prices, phone, WhatsApp, email and address correct
- All photos final and sharp
- Legal pages reviewed
- Every page checked on phone and laptop
- Every link clicked
- Every form submitted and received
- Payment flow tested, if any
- Site tested on a slow connection
Technical
- Domain points to the new site
- https lock sign shows on all pages
- Backup of old site saved
- Old addresses redirected
- Page titles and descriptions added
- Visitor measurement installed, if wanted
Launch day
- Quiet time chosen
- Live site tested again
- Real enquiry received
- Link shared only after tests passed
After launch
- Daily checks for 7 days
- Customer feedback collected
- Top 3 fixes done in week 2
- Monthly check scheduled
Who is responsible for each part of the launch?
You are responsible for content and approval, the designer for how the site looks and works on screens, and the developer for technical setup. Agree this split in writing before the final week.
A designer can check the built pages against the approved screens and list every difference. Mobile layout is one of the most common places where a built page differs from the design, which is why the mobile-first website design post matters. If you plan a new site and want the launch to go smoothly, you can plan it with me through my website design service.
Frequently asked questions
How long before launch should I start testing?
Start testing at least 3 to 5 days before the planned launch date. That time lets your team fix problems without rushing.
What is the most common mistake when launching a website?
Forms and contact buttons that do not reach the owner are a very common mistake. Submit every form yourself before you share the link.
Do I need a backup before going live?
Yes, if you replace an existing site, keep a full copy of the old site first. A copy lets you go back if something goes wrong.
What should I do if I find a bug after launch?
Write down the page, the device and the steps that caused the bug, then send the note to your developer or designer. Fix urgent bugs such as broken forms first.
Working on something like this?
Tell Tithi what you are planning. You get a clear scope, a fixed price and a timeline before any work begins. I reply to every enquiry within 24 hours.